The new Lucknow–Kanpur Expressway (sometimes referred to the “Lucknow-Kanpur Greenfield Expressway”) is under construction in Uttar Pradesh to significantly improve travel between Lucknow and Kanpur. Invest UP+3India TV News+3Indiatimes+3

Here are some key facts:

  • Length: ~ 63 km (some sources say ~62.7 km) from Shaheed Path, Lucknow to near Azad Marg/Chauraha in Kanpur. Invest UP+1

  • Lanes: Initially 6-lane access-controlled, expandable to 8 lanes. India TV News+1

  • Cost: About ₹4,700 crore. Invest UP+1

  • Travel time target: Reduce current road travel (≈1.5 to 3 hours) down to about 35-45 minutes. India TV News+3The Times of India+3Indiatimes+3

  • Project status: As of early/mid-2025 about 80% complete. Operational expected around June–July 2025 in many reports. India TV News+1


🎯 So will travel time be cut to 30 minutes?

  • The target being frequently cited is ~35-45 minutes, not 30 minutes. Indiatimes+1

  • Some headlines have rounded to “40 minutes” or “35 minutes” for effect. For example: “travel time to be reduced to 40 minutes”. India TV News

  • Realistically, 30 minutes for ~63km means an average speed of ~126 km/h (ignoring access, tolls, traffic, ramps). That is above typical Indian expressway running averages, so 30 minutes is likely optimistic unless conditions are ideal.

Conclusion: Travel time of ~35–45 minutes seems plausible (and is the official estimate). 30 minutes would be exceptional and not the publicly stated target. So the answer: not quite 30 minutes, but significantly shorter than current travel times.


🧭 Practical considerations

  • Once open, users will still have to factor in entry/exit, tolls, local access.

  • Travel time will improve only if you use the expressway entry/exit points and avoid city-traffic delays on either end (Lucknow side near Shaheed Path, Kanpur side near Azad Marg).

  • Enforcement of high speed will depend on traffic volume, weather, maintenance.

  • If you’re doing a door-to-door journey (e.g., starting inside Lucknow city or ending inside Kanpur city), add buffer time for first/last mile.


If you like, I can check updated construction status (as of Q4 2025) for the expressway and when it is actually expected to open. Would you like me to get that?

Comments

Popular posts from this blog

Vande bharat express

Key Figures & Highlights Overall Retail Vehicle Sales

सोने का महत्व